← Client Hub·ACTIVE · SHOVEL-READY

SunFarm Solar — Dominican Republic

50 MW AC / 59.69 MWp DC Bifacial PV + 25 MW / 100 MWh LFP BESS — Baní, Peravia Province

Sunfarming Dom Rep Invest, S.R.L. · RNC 1-31-94471-1 · Mercantil 158067-SD · Parent: Alensys Alternative Energiesysteme AG

50 MW

AC Capacity

59.69 MWp

DC Peak

100 MWh

BESS Storage

$90M

Total Basis

43.3%

Levered IRR

3.90x

Min DSCR

$81.7M

NPV @ 8%

440 ha

Land Area

Project Entity

NAMESunfarming Dom Rep Invest, S.R.L.
RNC1-31-94471-1
MERCANTIL158067-SD
COMPANY#549489
INCORPORATEDMay 17, 2019 (expires 2029)
PARENTAlensys Alternative Energiesysteme AG
MANAGERLeandro Corral
ADDRESS D EZum Wasserwerk 12, Germany
ADDRESS D RCalle Paseo del Conde 360, Santo Domingo

Project Location

Baní, Peravia Province, Dominican Republic

Parcela 59, Distrito Catastral 8

GPS: 18.300858°N, 70.361325°W

440.68 ha (4,406,824 m²) — Free & clear title

Owners: William Meredith Driver & Jorge Morales Paulino

Technical Specifications

Base Case — 50 MW (Per Concession)

Nominal: 50 MW AC · Peak: 59.69 MWp DC

DC/AC Ratio: 1.194

Concession Area: 161 ha (within 440.68 ha)

Grid: 138kV · Barra Peravia Solar I&II / Calabaza I

Transmission: 4.5 km double-circuit

BESS: 25 MW / 100 MWh / 4hr LFP

Total Investment: ~US$55M CAPEX

Design A — 140 MW Layout (Sept 2024)

Nominal: 140.4 MW AC · Peak: 161.5 MWp DC

Modules: Trina Solar TSM-715NEG21C.20 (715W) × 225,848

Inverters: Sungrow SG1100UD × 111

BESS: 324 MWh / 81 MW / 4hr LFP

Project Area: 262.35 ha · Fence: 4.68 km

String: 28 modules/string · 10° fixed tilt

Designer: Jairo Peña

Why Shovel-Ready

All Permits Secured

CNE concession, ETED interconnection, environmental license, land title — all obtained and revalidated.

📐

Engineering Complete

Professional layouts at 50MW, 100MW, and 140MW by Jairo Peña. 3D terrain renders and drone survey completed.

💰

26.9% Acquisition Discount

Acquiring at $35M vs. $47.9M appraised value. LARED independently assessed concession at $16.9M.

🏛️

10-Year Tax Holiday

Ley 57-07 provides 100% import duty exemption, ITBIS exempt, and 10-year income tax holiday. ~$20-50M savings.

SPV Architecture — 4 Entity Structure

HoldCo

Delaware LLC · Tax optimization · GP/LP structure

LandCo

440.68 ha · Parcela 59 DC-8 · Titled land · Agrivoltaic

EnergySPV

50 MW PV + 25 MW BESS · PPA · Grid · Operations

TokenSPV

$15M tokenization · 150K tokens · Reg D 506(c)